
The station chef 1960. Courtesy Lyall LaLonde.
Construction Era Photos for CAM-F.
The pictures below were selected from the extensive collection of Markham Cheever, the DEWLine’s Superintendent of Construction from 1953 to 1957, before the Line went operational. (Click on picture to enlarge.)
- Grumman Goose float plane, CF-HFF. Aug 1955.
- Material cache delivered by ski plane. April 1955.
- An aerial view of the almost completed CAM-F. Notice the 300 foot Dopplar tower. This will be home to 5-people. July 1956.